View Single Post
      09-22-2022, 12:51 PM   #7
Bking60
Private First Class
82
Rep
176
Posts

Drives: BMW X5 2019
Join Date: Sep 2020
Location: SC

iTrader: (0)

We had a house plan designer do it on autocad. I drew in the beam locations and the lumber supplier had the LVL dealer look it over. He beefed it up for CYA. The bank wanted the whole package but agreed to skip electrical plans since I was doing the entire electrical. They were adamant on having house elevations.
This was in a different county.
Appreciate 0